Login

   

Enter the text from the image:
This is a captcha-picture. It is used to prevent mass-access by robots. (see: www.captcha.net)

Forgot Your Password?
Forgot Your Login Details?

Call us on 01432 340589

The exclusive Peninsula Hotel, Guernsey purchases second CHP from First Enegy Ltd
Design and built in Hereford. Installed in Guernsey by our specialist team.
Designed with ease of maintenance in mind...
...tuned and programmed to run on 'synthetic natural gas'
Packaged to a high quality in an acoustically designed purpose built outdoor container
Rigerously tested prior to despatch to ensure expedient commissioning and long term reliability.
  • The exclusive Peninsula Hotel, Guernsey purchases second CHP from First Enegy Ltd
  • Design and built in Hereford. Installed in Guernsey by our specialist team.
  • Designed with ease of maintenance in mind...
  • ...tuned and programmed to run on 'synthetic natural gas'
  • Packaged to a high quality in an acoustically designed purpose built outdoor container
  • Rigerously tested prior to despatch to ensure expedient commissioning and long term reliability.

70kW Propane Gas CHP - Guernsey

The prestigiously refurbished Peninsula Hotel situated on the coast of Guernsey is now the proud owner of a new 70KWe CHP. Following 10 years of successful operations and the resultant energy savings of the a First Energy Ltd 50KW CHP, hotel owners have re-invested in a new and larger replacement module.

Energy costs on Guernsey are high as the island is not connected to a typical natural gas infrastructure. LPG is imported by Guernsey gas and blended to produce a 'synthetic natural gas' which is distributed around the island. Significant cost savings are available to high gas users by applying the principles of good quality CHP which offers a return on investment includuing all costs within 3-4 years.

With an electrical output of 70KW and thermal of 150KW, the new acoustically packaged outdoor CHP designed and built in Hereford was installed at the hotel on 5th Feb 2013. The entire process including its integration into the hotel's hot water service system was managed by First Energys experienced island installation team. Our engines are specifically designed, selected and tuned to run on the islands 'synthetic natural gas'. Power generation will offset the hotel's electrical load, whilst the CHP will provide heat energy for the hotel, its staff accomodation block, and its all-year-round outdoor swimming pool.

Hotel Manageress Ihya Pusilova 'remains comitted to the benefits of CHP' and having expereinced many years of successfull operation and reliability from the original First Energy unit was 'happy to embark on a replacement program work with the company' propogating the longstanding and successful partnership in power....