top of page
Arrow Down
SERVICES

SERVICES

Fabrication, sheet metal work

Welding & Fabrication

From design to fabrication, one offs to multiple batches, we can manufacture a diverse range of bespoke products, using mild steel, stainless or aluminium.

Welding acoustic enclosure

Acoustic Enclosures

Designed and built in house to exacting standards and your specific requirements, our standard build acoustic enclosures reduce source noise level by more than 50dbA

Stainless Steel pipework, mild steel pipe work

Pipework

Complete pipework service from fabrication to commissioning.

Electrical control panel

Control Systems

Whether a complete replacement generator control system, or simple motor controls, our panels are designed and built in house, before being installed and tested in the workshop before despatch.

Acoustic enclosure for generator

Power Generation

Power Generation

First Energy have always been best known for our power projects.

Bespoke design and fabrication

Bespoke Design

Each client and each project is different so at First Energy we offer an independent and bespoke approach

ADBA member logo
SCCS logo
UKCA logo
First Energy multi-disciplinary team

ABOUT

Since 1997 First Energy has worked with many companies, in many sectors and countries delivering a truly tailored approach. Whilst specialists in power generation and acoustic enclosures, First Energy offer the full package from design, through to build and installation.
 
Our multidisciplinary and dedicated team is based at our workshop in Herefordshire and is led by company Directors Peter Rutherford and Leon Crockett, who alone have over 60 years experience to draw from.  
 
The team consist of experienced welders, sheet metal workers, pipe fitters, gas engineers, electricians, CAD designers and project managers. We are committed to continuing professional development within the team and are proud that we offer apprenticeship opportunities.  Find out more on our news page.

Priding ourselves on delivering a bespoke service working closely with clients and partners alike.

ABOUT

1997

Year Established

60+

Years

Experienced

>200

Projects Completed

>300

MW Installed

PROJECTS

PROJECTS

CONTACT

CONTACT

Enquiries

For any enquiries or questions, please e-mail us at enquiries@firstenergy.co.uk or call us on the number below

Get in touch: 01432 340589

Office

Unit 4 Glebe Farm Industrial Estate

Stoke Edith, Herefordshire, HR1 4HG

Follow us:

  • Facebook
  • LinkedIn
  • X
  • YouTube
bottom of page